Compiled by Pete Coulman
See Also
- 185 DON MILLS ROCKET (2016-2018)
- 303 DON MILLS BLUE NIGHT (1987-2015)
- 325 DON MILLS NIGHT
- 925 DON MILLS EXPRESS
July 1, 1954
Coincident with the takeover of suburban bus operations in Metropolitan Toronto by the Toronto Transit Commission, service begins on a new TTC route replacing the former Hollinger Bus Lines IBM service. Buses on DON MILLS run from Pape and O'Connor (looping via south on Peplar Avenue, west on Woodville and north on Don Mills Road) via Don Mills Road through the Don Valley to Lawrence Avenue, looping via north and east on the Donway East and west on Lawrence. Service operates throughout the day on weekdays.
During rush hours, service is extended north on Don Mills to York Mills and west to the Sheriff's Plant located just west of the CNR railway crossing, looping in the parking lot.
One bus, operating out of Woodbine garage, provides a base service of every sixty minutes. During rush hours, a second bus increases service to every half hour.
DON MILLS |
LAWRENCE |
Monday to Friday, midday | |
DON MILLS |
YORK MILLS |
Monday to Friday, rush hours only |
Service on the "York Mills" branch is extended into a large counterclockwise loop west from the Sheriff's Plant, south on Leslie Street and west on Lawrence to route. Initially, this service is operated on a 90 minute headway. Saturday service is added to the "Lawrence" branch, operating from 12:30p.m. to 6:30 p.m.
A note from the period mentions that the TTC was considering extending service on Eglinton Avenue, possibly as a branch of this route. At this time, Eglinton Avenue ended at Laird Drive, and�did not resume until Don Mills Road. Leslie Street also ended at Lawrence Avenue. Metropolitan Toronto would not extend Eglinton Avenue for another year, and it would be another three years before Leslie Street was extended from Lawrence to meet up with Eglinton.
April 1, 1957
The 25A "York Mills" branch now operates every forty-five minutes during rush hours.
August 26, 1957
In conjunction with�the opening of the Eglinton Avenue extension between Laird and Victoria Park, and the inauguration of the 34 EGLINTON EAST bus, 25 DON MILLS is rerouted to run from Eglinton subway station via east on Eglinton and north on Don Mills, abandoning service south of Eglinton Avenue, but providing Don Mills residents direct access to�the subway.
DON MILLS |
25 |
LAWRENCE |
Monday to Friday, midday | ||
DON MILLS |
25A |
YORK MILLS |
Monday to Friday, rush hours only |
September 8, 1958
Weekday evening service is added, with the last bus departing at 12:30 a.m. Saturday service remains the same.
April 9, 1959
On this day, three buses operate on the 25A "York Mills" service, completing the 13 mile round trip in 70 minutes for a service frequency of every 15 minutes during the morning rush hour. During the midday, one bus operates the "York Mills" service at 60 minute intervals. During�the afternoon rush hour, 2 buses provide 20 minute service. During the evening and on Saturdays, 1 bus provides hourly service. A fourth rush hour bus was added on September 14 of this year, and a fifth on November 11.
December 14, 1959
DON MILLS SHOPPERS route inaugurated and written as part of the Don Mills schedules. Route runs Monday to Friday only, 9:30 a.m. to 3:30 p.m., every half hour.
Buses operate from Parkview Village Plaza at Victoria Park and Ellesmere via west on Parkwoods Village Drive, west on Brookbanks Drive, Three Valleys Drive and Laurentide Drive, west on York Mills Road and south on Don Mills Road before turning west on Lawrence Avenue and Banbury Road to loop clockwise via Larkfield Drive, returning via the reverse route.
DON MILLS |
25 |
LAWRENCE |
Monday to Friday, midday | ||
DON MILLS |
25A |
YORK MILLS |
Monday to Friday, rush hours only | ||
S P E C I A L | ||
Monday to Friday, midday |
May 11, 1960
DON MILLS SHOPPERS route - service reduced, with a single bus providing hourly service. At this time, the operation boasted an average of 65 daily boardings.
July 15, 1960
DON MILLS SHOPPERS route discontinued for the summer months
November 12, 1960
DON MILLS SHOPPERS route resumed service for the Christmas shopping season
December 30, 1960
The last day of operation for the DON MILLS SHOPPERS service. Route discontinued due to low ridership.
January 29, 1961
Sunday service added to the 25A "York Mills" branch, operating from 10:00 a.m. to 6:00 p.m.
March 2, 1965
25 DON MILLS service diverted due to bridge construction over the railway tracks near Bond Avenue. During normal hours and weekends, buses run from Eglinton Station over the regular route to Lawrence, then east on Lawrence, north on Donway East, south on Donway West, west on Lawrence, north on Leslie, east on York Mills and south on Don Mills to an off-street loop at Bond Street and return. During middays and evenings and on Saturdays, buses operate every 35 minutes. During Sundays and holidays, buses operate every 70 minutes.
During rush hours, service is split into two parts. One part operates from Eglinton station via the normal route to the Donway, looping via the Donway counterclockwise. The part circles the Donway and then runs via west on Lawrence, north on Leslie, east on York Mills and south on Don Mills to Bond, looping at an off-street loop. Both services operate at ten minute intervals.
July 25, 1965
CNR Rail bridgework completed south of Bond Street and 25A normal 'through' routing resumes.
February 26, 1966
Coincident with the opening of the BLOOR-DANFORTH SUBWAY, 25 DON MILLS service is rerouted off of Eglinton Avenue to operate via south on Don Mills, west on Overlea Boulevard, south on Millwood Drive, across the Leaside Viaduct and south on Pape to the new Pape station. Service is also extended north via north on Don Mills, past Sheppard, to loop around�the "Peanut Plaza" in Don Valley Village. During rush hours, service operates express from Pape station to Overlea Boulevard, stopping only at Mortimer and O'Connor, while local service is provided by 81 THORNCLIFFE PARK. Additional rush hour service is provided from Pape station to Lawrence, looping via Donway West. Service on Leslie is discontinued, replaced by the new 51 LESLIE bus.
DON MILLS |
25 |
DON VALLEY VILL. |
Monday to Friday, middays and evenings | ||
D O N MILLS E X P R E S S |
25B |
DON VALLEY VILL. |
Monday to Friday, rush hours only | ||
DON MILLS |
25C |
LAWRENCE |
Monday to Friday, rush hours only |
January 30, 1967
A service note on this date states that 25 "Don Valley Village" service operates at 20 minute intervals during weekday middays (9:10 a.m. - 3:10 p.m.) and evenings (7:00 p.m. - 12:20 a.m.) and during the daytime on Saturdays (5:45 a.m. - 6:40 p.m.). During the evenings on Saturdays (7:00 p.m.-12:20 a.m.) and on Sundays (8:45 a.m.-12:20 a.m.), service operates at 40 minute intervals.
25B "Don Valley Village Express" buses operate rush hours only at 12 minute intervals (5:45 a.m.-8:50 a.m. and 3:30 p.m.-6:52 p.m.) while four buses provide service on 25C "Lawrence" during rush hours.
September 16, 1968
Due to the closure of the Leaside Viaduct, southbound 25 DON MILLS buses detour off of Overlea and Millwood, running on Don Mills Road south of Overlea, through the Don Valley and up to O'Connor Drive before turning west on O'Connor and south on Pape to Pape station. Northbound buses reverse this routing.
February 8, 1969
With the reopening of the Leaside Viaduct to traffic, regular service resumes on 25 DON MILLS.
January 5, 1971
Service is extended north from the "Peanut Plaza" via north on Don Mills and east on Finch to a new off-street loop on the north side of Finch serving Seneca College.
DON MILLS |
25 |
F I N C H |
7 days a week, 18 hours a day | ||
D O N MILLS E X P R E S S |
25B |
F I N C H |
Monday to Friday, rush hours only | ||
DON MILLS |
25C |
LAWRENCE |
Monday to Friday, rush hours only |
Note: Owing to the large loop formed by the "Peanut" in the Don Valley Village, passengers who so desire may board buses northbound at Godstone Rd and at Deerford Rd and travel to the southbound zone boundary at Eglinton Ave on one Zone 2 fare, paid when boarding. To avoid misunderstandings, drivers will set transfers for southbound travel when northbound at Fairview Mall Drive.�
January 6, 1971
Service begins on a new rush hour branch serving the Lesmill Industrial area. Buses run from Pape station over the regular route to York Mills and then run west on York Mills, north on Lesmill, north on Valleybrook and west on Duncan Mill Road to Don Mills and south on Don Mills to route. This service replaces the 25C "Lawrence" branch.�
DON MILLS |
25 |
F I N C H |
7 days a week, 18 hours a day | ||
DON MILLS |
25A |
LESMILL |
Monday to Friday, rush hours only | ||
D O N MILLS E X P R E S S |
25B |
F I N C H |
Monday to Friday, rush hours only |
May 25, 1971
Service on the Lesmill loop is expanded. Buses now loop via Lesmill and Duncanmills, abandoning service on Valleybrook Drive. Buses operate every 16 minutes during rush hours.�
March 30, 1974
Concurrent with the extension of Don Mills Road across the Hydro right-of-way north of Finch, and the extension of the YONGE SUBWAY to Finch, all regular and express DON MILLS buses are extended north on Don Mills to loop at Steeles via east on Steeles, south on Townsend and west on Freshmeadow to Don Mills. Service to Seneca College is replaced by the new 39 FINCH EAST bus route from the newly opened Finch station. Service on the 25A branch is unchanged.
DON MILLS |
25 |
STEELES |
7 days a week, 18 hours a day | ||
DON MILLS |
25A |
LESMILL |
Monday to Friday, rush hours only | ||
D O N MILLS E X P R E S S |
25B |
STEELES |
Monday to Friday, rush hours only |
March 22, 1985
Last day of operation of 25B EXPRESS branch. Starting the following Monday (March 25), all rush hour buses run local between Pape station and Steeles Avenue.
August 30, 1985
Last day of operation for 25A "Lesmill' branch. Starting the following Tuesday (September 3), service into the Lesmill Industrial area is provided by the new 122 GRAYDON HALL route operating from York Mills station.�
September 3, 1985
Service begins on a rush hour short-turn branch operating from Pape station over the regular route to Lawrence, looping via Donway West and returning.
DON MILLS |
25 |
STEELES |
7 days a week, 18 hours a day | ||
DON MILLS |
25A |
LAWRENCE |
Monday to Friday, rush hours only |
March 1986 (or earlier)
While the exact date is unknown (the January 1986 Ride Guide does not show this change), by this month, service on the 25A "Lawrence" loop is extended, with buses from Don Mills and Donway running via west on Donway West, west on Barber Green Road, north and east on Overland Drive, north on the Donway West, south on the Donway East, back to Don Mills. No change to the destination signs, although some buses operate with a window card reading, "VIA BARBER GREENE".
September 8, 1987
On the request of the Town of Markham, a new rush-hour extension is launched, running from Pape station, over the regular route to Steeles Avenue and then continuing north across Steeles and up Leslie Street to Highway 7, looping counterclockwise via west on West Pearce, north on West Bever Creek Road and east on Highway 7 to Leslie, and return.
DON MILLS |
25 |
STEELES |
7 days a week, 18 hours a day | ||
DON MILLS |
25A |
LAWRENCE |
Monday to Friday, rush hours only | ||
DON MILLS |
25C |
HIGHWAY 7 |
Monday to Friday, rush hours only |
Fall 1987�(exact date unknown)
The 25A "Lawrence" rush hour short turn service resumes its loop on Donway West. Service no longer provided on Barber Greene.
May 24, 1988
At the request of the Town of Markham, weekday midday and Saturday daytime service is added to the 25C "Highway 7" branch. During rush hours, service is extended over a new branch to 16th Avenue, operating over the regular route to Highway 7 and then taking a large clockwise loop via west on Highway 7, north on West Bever Creek Drive and Granton, east on 16th Avenue, south on Mural and East Beaver Creek Drive and west on Highway 7 to Leslie and returning. Service operates half hourly during the morning rush hour, and every 29 minutes during the afternoon rush hour.
25C "Highway 7" service now runs middays only, Monday to Friday and Saturdays (12 hrs). NEW Monday to Friday rush hour extension to 16th Avenue running over the regular route to Highway 7, then a large clockwise loop via west on Highway 7, north on West Beaver Creek Drive and Granton, east on 16th Avenue, south on Mural and East Beaver Creek Drive and west on Highway 7 to Leslie and return AM 30-00 / PM 29-00)
DON MILLS |
25 |
STEELES |
7 days a week, 18 hours a day | ||
DON MILLS |
25A |
LAWRENCE |
Monday to Friday, rush hours only | ||
DON MILLS |
25C |
HIGHWAY 7 |
>Monday to Friday, middays | ||
DON MILLS |
25D |
16TH AVENUE |
Monday to Friday, rush hours only |
June 1989 (exact date unknown)
25A "Lawrence" rush hour short-turn service is discontinued.
September 4, 1990
At the request of the Town of Markham, the 25C and D loops are reversed. Buses now loop via east on Commerce Valley Drive East, north on East Beaver Creek Drive, north on Mural, west on 16th Avenue, south on Granton Drive, south on West Beaver Creek Drive, east on Highway 7, south on Commerce Valley Drive East and south on Leslie Street to route.
July 19, 1992
Weekday midday and Saturday daytime service added to the 25D "16th Avenue" branch. Service on the 25C "Highway 7" branch discontinued.
DON MILLS |
25 |
STEELES |
7 days a week, 18 hours a day | ||
>Monday to Friday, middays | ||
DON MILLS |
25D |
16TH AVENUE |
Monday to Saturday, daytime |
May 12, 2002
Weekday early-evening, Saturday early evening and daytime Sunday and holiday service is added to the 16th Avenue branch, at the request of York Region. Service operates every 30 to 40 minutes. There is no change in service levels or trip times south of Steeles Avenue.
November 24, 2002
Coincident with the opening of the SHEPPARD SUBWAY, all 25 DON MILLS buses enter the new Don Mills station in both directions.
May 11, 2003
At the request of York Region, weekend and holiday service is discontinued on the 25D "16th Avenue" branch. Service operates during weekdays only (5:30 a.m. - 9:20 p.m.).
NORTHBOUND |
|
SOUTHBOUND |
||
25 |
DON MILLS |
|
25 |
DON MILLS |
TO STEELES |
TO PAPE STN |
|||
7 days a week, 18 hours a day |
||||
25D |
DON MILLS |
|
|
|
TO 16th AVENUE |
|
|||
Monday to Friday, daytime and early evenings |
September 4, 2005
Service is made accessible with the use of Orion VII low-floor buses.
May 25, 2009
Bike rack service begins.
May 7, 2010
Last day of service on the 25D "16th Avenue" branch. On May 10, York Region Transit replaces service north of Steeles Avenue with augmented service on its 90B route.
25 |
DON MILLS |
|
25 |
DON MILLS |
TO STEELES |
TO PAPE STN |
|||
7 days a week, 18 hours a day |
March 27, 2016
Coincident with the launch of the parallel, limited-stop 185 DON MILLS ROCKET service, frequencies on the newly "local" 25 DON MILLS route are cut back all day weekdays and during the daytime on weekends and holidays. Service is blended between the two routes. No change to destination signs.
January 8, 2017
In order to maintain reliable service during the construction of the EGLINTON-CROSSTOWN LRT, service on 25 DON MILLS is revised, splitting the route at Don Mills station on the SHEPPARD subway. During weekday evenings and all day on weekends and holidays, buses will operate on the 25A "Paps Stn-Steeles" route, which matches the current route. During peak periods and midday on weekdays, however, buses on the 25B route will follow the normal route from Paps station to Don Mills and terminate there, while buses on the 25C route will operate from Don Mills station to Steeles. Additional running time is also added on the route.
NORTHBOUND |
|
SOUTHBOUND |
||
25A |
DON MILLS |
|
25A |
DON MILLS |
TO STEELES |
TO PAPE STN |
|||
Monday to Friday evenings |
||||
25B |
DON MILLS |
|
25A |
DON MILLS |
TO DON MILLS STN |
TO PAPE STN |
|||
Monday to Friday, rush hours and midday |
||||
25A |
DON MILLS |
|
25C |
DON MILLS |
TO STEELES |
TO DON MILLS STN |
|||
Monday to Friday, rush hours and midday |